Hawley Collection Building, Kelham Island Museum, Sheffield

Main Contractor
Millstone Building Ltd
Client:
kelham Island Museum
Package Value
£40k
Programme Schedule
June 2009 – September 2009
Sector
Commercial, Education

Provision of electrical installation in accordance with English Heritage guidelines and compliance with grade 2 listed building comprising of the following installations:

• Distribution boards
• Lighting and PIR control
• Emergency Lighting
• Small power
• Telephone installation
• Data installation
• Extension of CCTV system
• Specialist supplies
• Fire detection system
• Extension of intruder alarm system
• Sub-metering
• Testing and commission
• Demonstration of electrical services
• Provision of ‘As Installed Drawings and Operation/Maintenance Manuals'

All existing services needed to be upheld to the remainder of the museum completed due to the building being operational throughout the duration of the works.

Careful consideration for the routing of services throughout the building to fit in with its layout and features of the property to provide an aesthetically pleasing finish was taken into account in all areas to the employers and English Heritage guidelines/satisfaction.